Peat

milled peat

Mil­led pe­at is ext­rac­ted with mil­ling met­hod by re­moving the pe­at fi­eld’s top la­yer of 11 – 20 mm in depth. In or­der to fa­cili­tate the dry­ing of pe­at the ra­ke pro­cess is do­ne. Dri­ed pe­at la­yers are col­lected in swat­hes by pro­viding a pe­at ab­sorp­ti­on in pill­bo­xes with pne­uma­tic col­lectors. Ava­ilab­le frac­ti­ons of mil­led pe­at are – fr.0-7mm, fr.0-10mm, fr.0-20mm and fr.0-40mm. Mil­led pe­at is trans­por­ted in Big Ba­les on pal­lets or in bulk.

0-7

fr. 0-7mm

0-10

fr. 0-10mm

0-20

fr. 0-20mm

0-40

fr. 0-40mm

CUT PEAT

Cut pe­at is ext­rac­ted by cut­ting it me­chani­cal­ly from pre­pared pe­at fi­eld whi­le pre­ser­ving its na­tural struc­tu­re in non-split pe­at blocks. Cut pe­at is stac­ked and dri­ed in stacks by re­pe­ating the cyc­le three ti­mes un­til the hu­midi­ty do­es not ex­ce­ed 35 – 40%. Block di­men­si­ons are 18x30x50. Cut pe­at is trans­por­ted un­packed.

20190718_131332
20190718_131716
20190718_132224

CUT PEAT IN FRACTIONS

Upon cli­ent's de­sire pe­at can be gra­nula­ted me­chani­cal­ly, de­selec­ted in frac­ti­ons and pac­ked. Ava­ilab­le gra­nula­ted frac­ti­ons of cut pe­at – fr.0-10mm, fr.0-20mm, fr.0-40mm, fr.20-40, as well as ot­her fac­ti­ons. Frac­ti­ona­ted cut pe­at is trans­por­ted in Big Ba­les on pal­lets. Humification (%) H2 – H4; Active acidity (pH H2O) 3,4 – 3,7; Ash content (%) 0,3 – 4,4; Type of packing Big Bales.